{"product_id":"police-security-dover-1000-lumen-rechargeable-flashlight-usb-c-charging-cable-included-slide-focus-6-hour-runtime-impact-resistant-wbelt-clip","title":"Police Security Dover 1000 Lumen Rechargeable Flashlight ? USB-C Charging Cable Included, Slide Focus, 6-Hour Runtime, Impact Resistant ? w\/Belt Clip.","description":"\u003chr aria-hidden=\"true\" class=\"a-divider-normal\"\u003e     \u003ch1 class=\"a-size-base-plus a-text-bold\"\u003e About this item \u003c\/h1\u003e                     \u003cul class=\"a-unordered-list a-vertical a-spacing-mini\"\u003e  \u003cli class=\"a-spacing-mini\"\u003e\u003cspan class=\"a-list-item\"\u003e Ultra-Bright Performance: Delivers a powerful 1000 lumens with a beam distance of up to 210 meters?ideal for mechanics, automotive work, and emergency situations.  \u003c\/span\u003e\u003c\/li\u003e  \u003cli class=\"a-spacing-mini\"\u003e\u003cspan class=\"a-list-item\"\u003e Long-Lasting \u0026amp; Rechargeable: Equipped with a high-capacity 18650 2600mAh lithium-ion battery for up to 6 hours of runtime on Low mode. Rechargeable via included USB-C cable.  \u003c\/span\u003e\u003c\/li\u003e  \u003cli class=\"a-spacing-mini\"\u003e\u003cspan class=\"a-list-item\"\u003e Versatile Lighting Modes: Features 3 adaptable settings?High (1000 lm), Low (250 lm), and Flash?for various lighting needs, plus Slide Focus for adjustable beam control.  \u003c\/span\u003e\u003c\/li\u003e  \u003cli class=\"a-spacing-mini\"\u003e\u003cspan class=\"a-list-item\"\u003e Durable \u0026amp; Portable: Impact resistant with a compact 6.65' body and integrated belt clip for easy everyday carry. Built to handle tough work environments.  \u003c\/span\u003e\u003c\/li\u003e  \u003cli class=\"a-spacing-mini\"\u003e\u003cspan class=\"a-list-item\"\u003e No stand alone batteries are sold with this product  \u003c\/span\u003e\u003c\/li\u003e  \u003c\/ul\u003e   \u003c!-- Loading EDP related metadata --\u003e                   \u003cdiv id=\"product-details-jumplink\" class=\"a-section\"\u003e \u003cspan class=\"caretnext\"\u003e?\u003c\/span\u003e \u003ca id=\"seeMoreDetailsLink\" class=\"a-link-normal\" href=\"#productDetails\"\u003e See more product details \u003c\/a\u003e \u003c\/div\u003e","brand":"Souvela","offers":[{"title":"Default Title","offer_id":47742950146153,"sku":null,"price":76.95,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0656\/3538\/5449\/files\/41v7uu6CjjL._SS500.jpg?v=1783011881","url":"https:\/\/hs7s8y-r9.myshopify.com\/products\/police-security-dover-1000-lumen-rechargeable-flashlight-usb-c-charging-cable-included-slide-focus-6-hour-runtime-impact-resistant-wbelt-clip","provider":"My Prime Finds","version":"1.0","type":"link"}