1
/
of
6
Souvela
Police Security Dover 1000 Lumen Rechargeable Flashlight ? USB-C Charging Cable Included, Slide Focus, 6-Hour Runtime, Impact Resistant ? w/Belt Clip.
Police Security Dover 1000 Lumen Rechargeable Flashlight ? USB-C Charging Cable Included, Slide Focus, 6-Hour Runtime, Impact Resistant ? w/Belt Clip.
Regular price
$92.34 USD
Regular price
Sale price
$92.34 USD
Shipping calculated at checkout.
Quantity
Couldn't load pickup availability
About this item
- Ultra-Bright Performance: Delivers a powerful 1000 lumens with a beam distance of up to 210 meters?ideal for mechanics, automotive work, and emergency situations.
- Long-Lasting & Rechargeable: Equipped with a high-capacity 18650 2600mAh lithium-ion battery for up to 6 hours of runtime on Low mode. Rechargeable via included USB-C cable.
- Versatile Lighting Modes: Features 3 adaptable settings?High (1000 lm), Low (250 lm), and Flash?for various lighting needs, plus Slide Focus for adjustable beam control.
- Durable & Portable: Impact resistant with a compact 6.65' body and integrated belt clip for easy everyday carry. Built to handle tough work environments.
- No stand alone batteries are sold with this product
Share
